How to Get MUDA Building Plan Approval in Mysuru — Step by Step
A complete guide to getting your building plan approved by MUDA or BDA in Mysuru — documents required, fees, and timeline explained.
Getting your building plan approved is a mandatory legal step before starting construction in Mysuru.
The Process
1. Prepare Drawings: Have your architect prepare the plan as per local building bylaws (setbacks, FAR, etc.).
2. Submit Application: Apply online or through a registered engineer/architect with MUDA.
3. Site Inspection: A MUDA official will inspect the site to verify dimensions and road width.
4. Pay Fees: Pay the required betterment charges and scrutiny fees.
5. Approval: Receive your approved plan (usually takes 30-45 days).
Skanda Properties handles this entire process for our clients to ensure a hassle-free start.